Your building · Step 1 of 4

What kind of building is it?

About three minutes. Free, and no contact details needed to see your numbers.

Building type

Enter the town or address.

Utilities

Is the building in an NJ Overburdened Community, or is the owner income-eligible (affordable or income-restricted housing)? For PSE&G apartment buildings this raises the incentive cap from 60% to 80% of project cost.
Does any of these apply? Urban Enterprise Zone, Opportunity Zone, NJ Overburdened Community (NJDEP map), 501(c)(3) or 501(c)(19) nonprofit, K-12 school or local government. Any one can qualify for the higher Tier 2 incentive.

Who pays the utility bills?

Who pays
Heat
Electricity

What equipment does it have?

Answer what you know. “Not sure” is fine; we'll show what it affects.

Heating

Heating
Is there a second heating system? (e.g. rooftop units plus a boiler for the perimeter)
Boiler type
Where do I find this?

The boiler's nameplate, usually on the front or side jacket, lists “Input” in Btu/h or MBH. 750,000 Btu/h = 750 MBH = 750 kBtu/h. Use the input figure, and add all boilers together.

Read the nameplates for me (model numbers or photos · sharper sizes and ages)

Do the existing units have working economizers? (large buildings: sets the program's run hours, which can change the savings threefold)
Where do I find this?

Each rooftop unit has a metal nameplate on its side with a model number. A two- or three-digit number in it usually gives the size in thousands of Btu/h: 060 = 5 tons, 120 = 10 tons, 180 = 15 tons (12 = 1 ton). Add up all the units. Not sure? Leave it blank and we'll show a range.

What are you considering? (pick what a contractor proposed, or leave all unticked and we'll recommend)
Where do I find this?

On the same nameplate as the model number, look for “Input” or “Gas input” in Btu/h. 200,000 Btu/h = 200 kBtu/h. Add all units together, or leave blank.

How old is it?
Cooling
Cooling age
Hot water
Water heater age

In the apartments (owner-supplied appliances only)

Lighting

Bills and financing (optional)

Programs set the incentive tier from usage, not dollars. Skip this and we'll show the tier as not set.

Where do I find this?

On each electric bill, look for “Demand”, “Billed demand” or “Max kW” in the meter or charges section. Average the last 12 bills. If the bill shows no kW at all, the account is probably small: leave this blank.

Where do I find this?

Gas bills show therms (or CCF, about the same number) used each month. Add up 12 months. Many bills print a 12- or 13-month usage chart: add the bars.

Would you pay your share on the utility bill if the program offers it?

We show both ways either way. Your answer only changes what we list to verify.

Your estimate

Want help from a person? (optional)

The estimate above is yours to keep either way. If you'd like someone to verify it, compare bids or guide the project, send it to Netlift and we'll reply by email with what that would involve and what it would cost. Nothing is charged unless you agree in writing.

How Netlift is paid: optional paid advisory, the same whichever contractor you hire. We don't sell equipment, and we tell you in writing about any affiliated contractor or referral compensation before you choose. You choose who to hire.

Enter your name.

Enter a valid email.

Up to 3 files, 4 MB each.

Something went wrong. Please try again or email hello@netlift.energy.

Thanks, we have it.

We'll reply by email. A copy of your estimate is below.